House Project: Filtration System Complete
I went up to the house Thursday night. As I mentioned, we were putting some finer filtration stuff upstream of the lead filters--which had clogged within a week of installation.
The blue housings contain a five micron and then a one micron filter.
Click here to enlarge
Click here to enlarge
I then installed some new lead filters, and took water samples, both inside the house, and outside, from a faucet that runs directly from the water tank. I should have results in a week or so.
I notice that the water, which was murky and brownish without any filters at all, is now clear, with just the faintest yellowish tint--probably iron.
I just love the view out the front door of the garage.
Click here to enlarge
The only major piece of interior work is the baseboards in the laundry room. I need to annoy the builder to finish this up. The baseboards are painted--they just need to be put in place.
Click here to enlarge
I just love this view from the driveway, headed down the hill.
Click here to enlarge
Last house project entry.